Categories: Anti-corrosion Coatings, Primers
· DESCRIPTION
· INQUIRY FORM
Tech Data
WATERBORNE PRIMER
Waterborne epoxy
gray anti-rust primer
[XGE-HY-(A、B)]
Product Intro
waterborne epoxy iron red anti-rust primer
is a two-component quick-drying waterborne epoxy anti-rust primer containing
active anti-rust pigments and flash rust inhibitors.
Recommended
Applications
Used as a universal primer for steel
surfaces in slight and moderate corrosive environments, the surface can be
coated with waterborne acrylic, waterborne epoxy, waterborne polyurethane, and
suitable solventborne coatings.
Film
thickness and coating rate
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Minimum
|
Maximum
|
Typical
|
Dry film thickness (um)
|
25
|
60
|
40
|
Wet film thickness (um)
|
40
|
100
|
70
|
Theoretical coating rate (m2/kg)
|
12
|
6
|
8
|
Physical
character
|
|
|
|
|
|
|
|
|
|
|
|
Color
|
Gray
|
Solid contents
|
60%
|
flashing point
|
nil
|
Gloss
|
Semi-gloss
|
Water-resistance
|
Favorable
|
Flexibility
|
excellent
|
Surface Treatment
All surfaces
should be clean, dry and free from dirt, and the surface should follow ISO8504
before evaluation and processing.
Bare steel
Cleanliness: Sand blasting to a
minimum of Sa 2 1/2(ISO 8501-1:1988) or ultra-high pressure
spray water treatment to WJ 2 during maintenance (NACE No.
5/SSPC-SP 12). Roughness: Treated to fine to
medium (30-85 μm, Ry5) (ISO 8503-2) with angular sand (G).
Steel coated with primer
clean, dry and approved primer
Other surfaces
This product can be applied on other
substrate. Refer the details to the company.
Engineering
Conditions
Substrate temperature must not be lower than
10°and should be at least 6°or more above the dew point of the air. Temperature
and relative humidity should be measured near the substrate. In narrow area
Good ventilation is usually required to
ensure proper drying.
Manner of application
Spray coat
Use airless spray or air spray.
Brush coat
It is recommended for pre-coating and small-area coating, but the
required dry film thickness must be achieved.
Roll coat
It can be used in small areas, but it is not recommended as the first primer . In the case of roller
coating, sufficient materials must be applied to achieve the specified dry film
thickness.
Engineering Specs
Mixing ratio (mass ratio) component A:componentB=5∶1,stir
evenly. To ensure proper mixing, the two components are mixed
Use
a mechanical stirrer to stir the mixture, and use a mechanical stirrer after
mixing the two components.
Stir
evenly. ( at least 1 minutes)
service life after mixture(23℃)is 4hours
Attn: The paint can no longer be used beyond its service life. It is
recommended to use the alarm notice
before
its expiry.
Thinner/cleaner water
Spraying
parameters When applying by spray
coating, it is necessary to adjust according to the actual spraying conditions.
It is recommended to test the spray in a small area and obtain the proper spray
parameters before coating.
Drying time
Factors such as ventilation conditions,
temperature, film thickness, and coating degree will affect drying time.
Typical data listed in the table below are based on the following conditions:
** Good ventilation (outdoor or natural air
circulation) * *Typical film thickness
** Unigrade coating on inert substrates *
*Relative humidity 70%
Substrate temperature
|
10℃
|
15℃
|
23℃
|
40℃
|
surface dry
|
80 minutes
|
60 minutes
|
45 minutes
|
45 minutes
|
solid dry
|
2 days
|
2 day
|
15 hours
|
10 hours
|
Solidify
|
14 day
|
10 day
|
7 day
|
5 day
|
The shortest coating time interval
|
24 hours
|
16 hours
|
10 hours
|
6 hours
|
The above data is for guidance only, actual
drying time/The time interval before coating can be long or short, depending on
the film thickness, ventilation conditions, humidity, the underlying paint,
advance loading and unloading requirements, and mechanical strength. For the
complete package, see the corresponding supporting records which includes all
parameters and special conditions.
Typical
package
Corrosion environment classification:C4(ISO
12944)slight corrosion environment
waterborne epoxy iron red anti-rust
primer 2 x 40 um (
dry film thickness)
waterborne epoxy zinc-rich primer 2 x 35 um ( dry film
thickness)
Corrosion environment classification:C5-I(ISO
12944)Moderate corrosion environment
waterborne epoxy zinc-rich primer 1 x 40 um ( dry film
thickness)
waterborne epoxy iron red anti-rust
primer 2 x 40 um (
dry film thickness)
waterborne epoxy zinc-rich primer 2 x 35 um ( dry film
thickness)
The specific circumstances can be formulated
with other supporting records.
Tech Data
Technological
Statement
|
Technical
index
|
Testing
Method
|
remark
|
1. Appearance
|
Two-component
|
Visual inspection
|
|
2. The viscosity out of factory
|
80-105
|
GB/T1723-93
|
|
3. fineness (um)
|
≤45um
|
GB1724-2019
|
|
4. Solid content (%)
|
≥ 55
|
GB1725-2007
|
|
5. Theoretical coating rate (㎡/kg)
|
8
|
Plates coated inside the
factory
|
|
6. Covering power g/㎡
|
≤70
|
GB1726-79
|
|
7. Adhesion (circling method)
|
Class 1
|
GB1720-89
|
|
8. Drying time
|
surface dry 30 min, solid
dry 24h
|
GB6753.2-86
|
Temperature≥25°C; Humidity≤70
|
9. Thickness of dry film (um)
|
≥ 40
|
GB1764-89
|
|
10. Dry film gloss %
|
semi-gloss
|
|
|
11. Pendulum hardness
|
≥ 1
|
GB/T1730-93
|
|
12. Impact resistance (kg/cm)
|
50
|
GB/T1732-2020
|
|
13. Flexibility (mm)
|
1
|
GB6742-2007
|
|
14. Alkali resistance (h)
|
120
|
GB9265-88
|
Soaked in 2% NaOH solution
|
15. Acid resistance (h)
|
100
|
GB9274-88
|
Soaked in 2% H2SO4 solution
|
16. Salt-fog resistance
|
850
|
GB/T1771-2007
|
|
17. water-resistance (h)
|
1000
|
GB/T1733-93
|
|
18. VOC emission
|
- ≤48
|
hj2537-2014
|
National Standard below 200
|
Other
information
Construction equipment preparation and
cleaning procedures
In order to avoid contamination of the
waterborne paint by the solvent, the spray equipment must be properly adjusted
before use. All solvent-contacting pumps, tubes, guns, etc. must be thoroughly
cleaned according to the following steps:
If the construction equipment is made of
stainless steel and is used exclusively for the construction of waterborne
paints, this preparation and cleaning work is not required.
Before spraying: Rinse with water in
equipment and pipes until it is thoroughly clean.
After spraying: Rinse the equipment and
piping with water and leave no residual paint.
Storage
It must be stored in accordance with
national regulations. The storage environment should be dry, cool, well
ventilated, and away from sources of heat and fire. The packaging container
must be kept closed and frozen.
Storage life:23°C,Component A,1year;Component
B,1 year Then it is necessary to check again to determine. The increase in
storage temperature will significantly shorten the storage life.
Loading
Loading with caution. Stir evenly before
use.
Package Spec
20Kilos:component A 17.5Kilos,component B
2.5 Kilos
Depending on local needs, different
packaging specifications may be available in different countries.
Health and safety
Please note the warning label on the
container. Use in good ventilation. No inhaling coating fog. No contact with
skin. Paint splashed on the skin should be immediately flushed with a suitable
cleaning agent, soap and water. Paint splashed into eyes should be thoroughly
cleaned with water and seek medical attention immediately.
For detailed health and safety information
and precautions for this product, please consult our Material Safety Handbook.
Declaration
The information provided in this product
specification is based solely on the knowledge we have gained in the laboratory
and in practice. However, since the use of products is usually out of our
control, we only guarantee the quality of the products. We reserve the right to
modify this manual without prior notice.
Anhui SGTECH Coating Technology
Co.,Ltd.