Date
|
Exported Country
|
Product
|
Color
|
Volume (L)
|
Customers
|
2019-07-04
|
Côte d'Ivoire
|
Waterborne anti-rust
primer
|
Grey
|
2160
|
Infoland Ceramics
|
2019-07-04
|
Côte d'Ivoire
|
Waterborne
anti-corrosion topcoat
|
Red
|
1380
|
Infoland Ceramics
|
2019-07-04
|
Côte d'Ivoire
|
Waterborne
anti-corrosion topcoat
|
White
|
720
|
Infoland Ceramics
|
The main construction steps for waterborne coatings can follow the following process:
1) Prepare work and surface cleaning, pay attention to the cleaning of the galvanized layer.
2) Apply water-based anti-rust primer (select roller, dip, spray or brush for different equipment and conditions).
3) Ventilation and drying to be thorough.
4) Apply water-based anti-corrosion topcoat.
5) Ventilation and drying to be thorough.
6) After the equipment is installed, the coating is repaired (only for the damage of the coated coating during the installation process).
7) Construction is completed.¡£