+8613349251166£»0086 (550) 7647288 ;
Home Products About Us Workshop Projects Certificates News Contact
Export Data 3
Views£º3150   Time£º2020-7-27

Date

 Exported Country

Product

Color

Volume (L)

Customers

2019-03-04

Zambia

Waterborne anti-rust primer

Grey

3865

Infoland Ceramics

2019-03-04

Zambia

Waterborne anti-corrosion topcoat

Red

1625

Infoland Ceramics

2019-03-04

Zambia

Waterborne anti-corrosion topcoat

White

1265

Infoland Ceramics

2019-03-18

Guinea

Waterborne anti-rust primer

Grey

450

Infoland Ceramics

2019-03-18

Guinea

Waterborne anti-corrosion topcoat

White

450

Infoland Ceramics

2019-03-28

Zambia

Waterborne anti-rust primer

Grey

3310

Infoland Ceramics

2019-03-28

Zambia

Waterborne anti-corrosion topcoat

Red

1455

Infoland Ceramics

2019-03-28

Zambia

Waterborne anti-corrosion topcoat

White

1135

Infoland Ceramics

The main construction steps for waterborne coatings can follow the following process:

1)        Prepare work and surface cleaning, pay attention to the cleaning of the galvanized layer.

2)        Apply water-based anti-rust primer (select roller, dip, spray or brush for different equipment and conditions).

3)        Ventilation and drying to be thorough.

4)        Apply water-based anti-corrosion topcoat.

5)        Ventilation and drying to be thorough.

6)        After the equipment is installed, the coating is repaired (only for the damage of the coated coating during the installation process).

7)        Construction is completed.¡£